<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/132/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Mon, 09 Jul 2018 13:07:37 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title>South Street, Romford</title>
<guid isPermaLink="false">greenfield_137002</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was employed by IC Construction to undertake the demolition works at 64 South Street, Romford. The building was a former nightclub and in mid-terrace with two very busy retail/financial stores either side. The building was to be demolished behind the front facade making way for a residential and commercial development.</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Separations</li>
<li>Hand Demolition to the rear of the site</li>
<li>Demolition</li>
<li>Remove slab and foundations</li>
<li>Crush hardcore and concrete arisings and stockpile</li>
<li>Reduced dig to create basement area (clear from site)<br />&nbsp;</li>
</ul>
<h4><u>Challenge</u>:</h4>
<p>Greenfield&rsquo;s biggest challenge on this project was later on in the project. With the crushed material being reused by the client in the early stages of construction, Greenfield had to mobilise around a tight site during the reduced dig.&nbsp;</p>
<h4><span style="text-decoration: underline;">Solutions:</span></h4>
<p>To enable us to reduce this challenge, Greenfield swapped one of our larger 22t Excavator for one of our smaller 13t Excavators. We have grown strong working relationships with local suppliers in and around the South East and worked closely with the haulage company to enable the amount of inert material that was being excavated being stockpiled</p>
<h4>Project Review</h4>
<table style="height: 120px; width: 265px;">
<tbody>
<tr>
<td style="width: 89px;">Client:</td>
<td style="width: 169px;">I C Construction</td>
</tr>
<tr>
<td style="width: 89px;">Location:</td>
<td style="width: 169px;">Romford, Essex</td>
</tr>
<tr>
<td style="width: 89px;">Start:</td>
<td style="width: 169px;">April 2016</td>
</tr>
<tr>
<td style="width: 89px;">Completed:</td>
<td style="width: 169px;">July 2017</td>
</tr>
<tr>
<td style="width: 89px;">Phases:</td>
<td style="width: 169px;">Four</td>
</tr>
<tr>
<td style="width: 89px;">Recycled:</td>
<td style="width: 169px;">99%</td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/101/South-Street-Romford</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|101&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg01ed616491&amp;ft1542211949&amp;IMG-20160720-WA000.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Aldi Store, Peterborough</title>
<guid isPermaLink="false">greenfield_137403</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4>Client:&nbsp;</h4>
<p>Camford Construction Management</p>
<h4>Location:</h4>
<p>Peterborough</p>
<h4>Our Role:</h4>
<p>Sub-Contractor</p>
<h4>Summary:</h4>
<p>Strip out and Alterations for new Aldi Store</p>
<h4>Scope:</h4>
<p>&bull; Removal of cladding from front elevation<br />&bull; Removal of block work wall from front elevation<br />&bull; Remove roller shutter door<br />&bull; Removal of fascia capping and set aside for reuse<br />&bull; Clear all arisings from site</p>
<h4>Program:</h4>
<p>5 days</p>
<h4>Recycling:</h4>
<p>100%<br /><br /></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/148/Aldi-Store-Peterborough</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|148&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgb9ce7d80a0&amp;ft1582279673&amp;d9a23dd0-402a-4742-a4ae-0e50c73df5a8.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Aldi Store, Upminster</title>
<guid isPermaLink="false">greenfield_165617</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4>Client:&nbsp;</h4>
<p>Camford Construction Management</p>
<h4>Site:</h4>
<p>Aldi Store, St Mary's Lane, Upminster, London</p>
<p>Our Role:</p>
<p>Greenfield Demolition was awarded the strip out works by Camford to act as subcontractor. This would be our fifth project for DSP / Camford.</p>
<h4>Scope:</h4>
<ul>
<li>Strip out store back to shell</li>
<li>De-gas and remove refrigeration units<br />&nbsp;</li>
</ul>
<h4>Challenge:</h4>
<p>The greatest challenge we faced on this project was the time frame given for our program. We had two weeks to get the store stripped back to it's shell as Aldi required the shop to be live as soon as possible.&nbsp;</p>
<h4>Solutions:</h4>
<p>We opted to use a skidsteer and 3t excavator to do the bulk of the heavy work to reduce the risk of manual handling.We employed local labour to enable us to work longer shifts and help push the project along. We completed the project on time and within budget.</p>
<h4>&nbsp;</h4>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/158/Aldi-Store-Upminster</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|158&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg7e5c1c1b2d&amp;ft1582279391&amp;AldiPhoto31-07-20182132293.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>The Orchards Shopping Centre, Haywards Heath</title>
<guid isPermaLink="false">greenfield_137017</guid>
<pubDate>Mon, 09 Jul 2018 12:55:24 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the strip out and alterations contract by RB Construction for Unit 20 &amp; 21 The Orchard Shopping Centre where the two units will be merged into one.</p>
<p>This is the third contract completed for R&amp;B Construction Group</p>
<h4>Our Scope:</h4>
<ul>
<li>Carry out the soft strip</li>
<li>Partial Removal of wall</li>
<li>Remove part of the existing load bearing wall</li>
<li>Form openings</li>
<li>Saw cut the existing slab</li>
<li>Break out remainder of load bearing wall</li>
</ul>
<p>&nbsp;</p>
<h4>Project Review</h4>
<table style="width: 311px;">
<tbody>
<tr>
<td style="width: 85px;">Client:</td>
<td style="width: 240px;">RB Construction</td>
</tr>
<tr>
<td style="width: 85px;">Location:</td>
<td style="width: 240px;">Hayward Heath, West Sussex</td>
</tr>
<tr>
<td style="width: 85px;">Start:</td>
<td style="width: 240px;">September 2016</td>
</tr>
<tr>
<td style="width: 85px;">Finish:</td>
<td style="width: 240px;">September 2016</td>
</tr>
<tr>
<td style="width: 85px;">Program:</td>
<td style="width: 240px;">2 weeks</td>
</tr>
</tbody>
</table>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/116/The-Orchards-Shopping-Centre-Haywards-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|116&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0c1abadfb6&amp;ft1542211984&amp;IMG-20160831-WA010.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Homebase, Stevenage</title>
<guid isPermaLink="false">greenfield_137009</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed by Faircloth Construction to undertake the demolition works of a Homebase, Roaring Meg Retail Park, Stevenage. Greenfield Demolitions scope of works was to disconnect services, strip out warehouse, demolish, grub out slab and foundations and crush all arisings on site</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge Greenfield Demolition had to contend with was the close proximity of the neighbouring store. The neighbouring store was situated within 4 metres of the Homebase store.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">Greenfield overcame this challenge under close supervision and a watchman. We also used our highly experienced machine operator who used a grab attachment to carefully bring the panels safely in a controlled manner into the site.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/108/Homebase-Stevenage</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|108&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3ca2e61e72&amp;ft1542211950&amp;IMG-20160720-WA010.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Toys’R’Us, Stevenage</title>
<guid isPermaLink="false">greenfield_137012</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed to undertake the demolition works of a Toys&rsquo;R&rsquo;Us store in Stevenage. This was our second project for Faircloth in Roaring Meg Retail Park. </span></p>
<p class="p1"><span class="s1">The Toys&rsquo;R&rsquo;Us store was to be demolished, the slabs and foundations removed with all concrete arisings to be crushed on site and left for re-use for the new build.</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge was that the Toys&rsquo;R&rsquo;Us store was adjoined to a neighbouring store.</span></p>
<p class="p1"><span class="s1">Further to this, being in a retail park we had to take into consideration noise and vibrations when undertaking the demolition, especially breaking out the slab and foundations.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">Using a different method to a standalone building, Greenfield used various techniques to reduce vibrations affecting the neighbouring store. </span></p>
<p class="p1"><span class="s1"> The bay adjoining the store was the highest risk point so to overcome the challenge of the beams, Greenfield used an excavator and grab attachment to hold the beam in place to act as a temporary prop. An operative then cut through the beam with the burning gear. With the machine still in place, the 45t with sheer cut through at the middle of the bay enabling the other operator to lower the beam safely to the ground in a controlled manner. </span></p>
<p class="p1"><span class="s1"> When it came to removing the slab, operative saw cut a line 1 metre away from the adjoining store into the slab. This helped to remove the slab without causing disturbance to the neighbouring store.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/111/ToysRUs-Stevenage</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|111&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgc7cc9dd45b&amp;ft1542211951&amp;20160225_114600.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>B&amp;Q, Rochester</title>
<guid isPermaLink="false">greenfield_137013</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p>Greenfield Demolition was employed to undertake the asbestos removal and demolition works of a B&amp;Q Store at Strood Retail Park. We used a subcontractor who have worked alongside us for ten years and remove 3500m&sup2; of roof sheets from the retail store. Following the removal of the asbestos, Greenfield Demolition stripped and demolished the B&amp;Q Store, removed slab and foundations and crush all hardcore arisings, stockpile and leave on site.</p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p>The main challenge was that the B&amp;Q store was adjoined to a neighbouring store.</p>
<p>Further to this, being in a retail park we had to take into consideration noise and vibrations when undertaking the demolition, especially breaking out the slab and foundations.</p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p>Using a different method to a standalone building, Greenfield used various techniques to reduce vibrations affecting the neighbouring store.</p>
<p>The bay adjoining the store was the highest risk point so to overcome the challenge of the beams, Greenfield used an excavator and grab attachment to hold the beam in place to act as a temporary prop. An operative then cut through the beam with the burning gear. With the machine still in place, the 45t with sheer cut through at the middle of the bay enabling the other operator to lower the beam safely to the ground.</p>
<p>When it came to removing the slab, operative saw cut a line 1 metre away from the adjoining store into the slab. This helped to remove the slab without causing disturbance to the neighbouring store.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/112/BQ-Rochester</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|112&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf3eabfd624&amp;ft1542211951&amp;IMG-20160421-WA005.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>