<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/138/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Mon, 09 Jul 2018 12:21:34 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title>Elthorne Primary School, London</title>
<guid isPermaLink="false">greenfield_137016</guid>
<pubDate>Mon, 09 Jul 2018 12:21:34 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the strip out works at Elthorne Primary School by Jerram Falkus Construction to strip a classroom block at a school in Hanwell. This job was to be completed over one phase and we acted as a subcontractor.</p>
<p>This was our first project for Jerram Falkus Construction</p>
<h4>Our Scope:</h4>
<ul>
<li>Strip out classrooms</li>
<li>Remove partitioning walls</li>
<li>Remove windows and doors</li>
<li>Remove ceilings</li>
<li>Remove M&amp;E equipment</li>
</ul>
<h4><u><br />Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out on a live school. We had a very tight time-frame to complete our works to allow Jerram to undertake their main works during the school holidays.</p>
<h4><u>Solutions</u></h4>
<p>Greenfield sourced trained local labour to enable us to complete the strip out of the classroom block in the three-day period. Greenfield sourced local suppliers who were able to remove the waste when required and make deliveries accordingly too.</p>
<h4>Project Review:</h4>
<table style="height: 132px;" width="257">
<tbody>
<tr>
<td style="width: 124.258px;">Client:</td>
<td style="width: 124.258px;">Jerram Falkus</td>
</tr>
<tr>
<td style="width: 124.258px;">Location:</td>
<td style="width: 124.258px;">Hanwell, London</td>
</tr>
<tr>
<td style="width: 124.258px;">Start:</td>
<td style="width: 124.258px;">July 2017</td>
</tr>
<tr>
<td style="width: 124.258px;">Complete:</td>
<td style="width: 124.258px;">July 2017</td>
</tr>
<tr>
<td style="width: 124.258px;">Recycled:</td>
<td style="width: 124.258px;">97%</td>
</tr>
</tbody>
</table>
<p>&nbsp;<br />&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/115/Elthorne-PS-London</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|115&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5c8f72b9e2&amp;ft1542211984&amp;ElthornePark2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Heathermount School, Ascot</title>
<guid isPermaLink="false">greenfield_137014</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p>Greenfield Demolition were awarded the demolition works at Heathermount School by Beard Guildford to demolish a caretakers shed, two houses and removal of a slab. This job is to be completed over two phases</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove all arisings from site</li>
</ul>
<p>The first phase Greenfield was employed to demolish the caretakers workshop and break out and remove the slab where a former building was situated.</p>
<p>The second phase consisted of the demolition of the two houses. This phase also consisted of removal of notifiable asbestos, slab and foundation removal and clear all materials from site.</p>
<h4><strong>Challenges</strong></h4>
<p>The biggest challenge on this project was during the first phase where the school remained live.</p>
<p>During the second phase the program was one week to enable the project being completed before the start of school.</p>
<h4><strong>Solutions</strong></h4>
<p>Greenfield Demolition worked closely with Beard and had a safe system procedure. All site personnel were to stop works immediately if a pupil was to enter the site. A school official would escort the pupil off site and then work would continue</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/113/Heathermount-School-Ascot</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|113&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf9afc5b4a0&amp;ft1542211951&amp;HeathermountSchool.jpg" length="100" type="image/jpg" />
</item>