<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/175/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Fri, 30 Aug 2024 15:45:02 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title>Project Outcomes</title>
<guid isPermaLink="false">greenfield_194095</guid>
<pubDate>Fri, 30 Aug 2024 15:45:02 +0100</pubDate>
<description><![CDATA[<p>The demolition of Lyons Road was completed successfully allowing the following trades to undertake their works without delay. Key outcomes include:</p>
<ul>
<li>Safe removal of all hazardous materials from the site.</li>
<li>Successful recycling of 99% of demolition materials, contributing to the project&rsquo;s sustainability goals, excluding the onsite crushed concrete that remained on site to be reused during the development.</li>
<li>Zero safety incidents or accidents reported.</li>
<li>Working close with party wall surveyors working to approved method statements and safe system of works for undertaking the separation of the office and neighbouring building.</li>
</ul>
<p>Through meticulous planning, rigorous safety protocols, and collaboration with key stakeholders, the project was executed efficiently and with minimal disruption to the surrounding community.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/179/Project-Outcomes</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|179&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg1ad0459a84&amp;ft1728403427&amp;5..jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Project Overview</title>
<guid isPermaLink="false">greenfield_194094</guid>
<pubDate>Fri, 30 Aug 2024 15:33:15 +0100</pubDate>
<description><![CDATA[<p>The demolition project at Lyons Road was undertaken as part of the redevelopment of redundant police storage depot to provide a new commercial development in the heart of Merton, Surrey. The existing structures, approx. 5400m² combined, had reached the end of its lifecycle and was no longer deemed fit for purpose. The site was situated on an industrial estate in the heart of Merton Abbey.</p>
<p>The site posed many technical requirements, such as party wall separations, working alongside UXO survey teams and working alongside remedial works teams.</p>
<p>Initially the works were down to the top of slab until trial holes discovered contamination beneath the slab which Greenfield assisted with the removal works.</p>
<p>Greenfield’s experience was key to the success of this project.</p>
 
]]></description>
<link>https://www.greenfieldgroup.uk.com:443/178/Project-Overview</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|178&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgef5b69072b&amp;ft1728403356&amp;3..jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Scope of Works</title>
<guid isPermaLink="false">greenfield_194093</guid>
<pubDate>Fri, 30 Aug 2024 15:10:25 +0100</pubDate>
<description><![CDATA[<ul>
<li>Subcontractor</li>
<li>Demolition Notice (Section 80/81)</li>
<li>Notifiable Asbestos Removal</li>
<li>Non-Notifiable Asbestos Removal</li>
<li>Site Specific Method Statement and Risk Assessment</li>
<li>Demolition Works</li>
<li>Slab and Foundation Removal</li>
<li>Onsite Crushing</li>
<li>Screening to Type 1 grade</li>
<li>Waste Removal</li>
<li>Remediation Works</li>
<li>Fuel Tank Extraction</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/177/Scope-of-Works</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|177&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgb325dba247&amp;ft1728464245&amp;lyonsScope.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Lyons Road</title>
<guid isPermaLink="false">greenfield_194092</guid>
<pubDate>Fri, 30 Aug 2024 15:06:25 +0100</pubDate>
<description><![CDATA[<p>We were employed to carry out the demolition works of the site at the disused office and warehouse building in Merton for a modernised warehouse development.</p>
<p>The two structures were a combination of single-storey&nbsp; and two storey buildings and warehouses, covering an area of approximately 5400m&sup2;. </p>
<p>Construction was a mix of brick and masonry buildings, with cement bonded roof sheets and steel portal frame buildings.</p>
<div class="grid-wrapper grid-three">
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-01.png" />
<h4>2713 Man Hours</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-02.png" />
<h4>4966 Tonnes</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-03.png" />
<h4>15 Weeks</h4>
</div>
</div>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/176/Lyons-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|176&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2659a7adbc&amp;ft1728464221&amp;lyonsRedevelopment.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>