<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/207/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Fri, 30 Aug 2024 15:05:14 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title></title>
<guid isPermaLink="false">greenfield_193970</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/163/Hockley-Industrial-Estate</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|163&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg743f8a05f9&amp;ft1725026986&amp;Picture3.1.1.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194039</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/170/Lilford-Business-Centre</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|170&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg7253f448d0&amp;ft1731067053&amp;bannerDemolition2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194091</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/175/Lyons-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|175&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg986f914b1e&amp;ft1728408962&amp;lyonsBottom.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_197241</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/215/Bensham-Lane-Thornton-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|215&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg659a11f1b5&amp;ft1769603015&amp;benshamFWBannerExt.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Harley Street and Wigmore Place</title>
<guid isPermaLink="false">greenfield_137019</guid>
<pubDate>Tue, 24 Jul 2018 15:17:31 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Buxton Building Contractors</p>
<h4>Site:</h4>
<p>Harley Street and Wigmore Place, Marylebone</p>
<h4>Our Role</h4>
<p>Greenfield Demolition were awarded the subcontract package for Buxton Building Contractors. This was our fourth project awarded by Buxton in the space of twelve months.</p>
<p>The works included the strip out and alterations of the Grade II listed building in the heart of London.</p>
<h4>Our Scope</h4>
<ul>
<li>Strip out both structures</li>
<li>Create openings</li>
<li>Demolition of the link building between Harley Street and Wigmore Place</li>
<li>Removal of the roof of Wigmore Place</li>
</ul>
<h4>&nbsp;</h4>
<h4>Challenges:</h4>
<p>There were multiple challenges throughout this project. Site logistics, multiple trades, program, contaminated waste, to name a few.</p>
<h4>Solutions:</h4>
<p>Prior to the project commencing Greenfield representatives worked closely with local suppliers regarding site logistics (delivery and collection times). Greenfield was given a one week head start before following trades started coming on to site so that Buxton were able to achieve their program.&nbsp;</p>
<p>This project was a great way to start 2018 in such a prestigious area of London.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/118/Harley-Street-and-Wigmore-Place</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|118&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5be72b1ead&amp;ft1542211984&amp;2018-01-15-PHOTO-00000006.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Oak Hill Grove</title>
<guid isPermaLink="false">greenfield_137343</guid>
<pubDate>Tue, 24 Jul 2018 15:17:31 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Croudace Portland</p>
<h4>Site:</h4>
<p>4 Oak Hill Grove, Surbiton</p>
<h4>Our Role</h4>
<p>Greenfield Demolition were awarded the demolition package to act as Principal Contractor. This was our first project for Croudace Portland.</p>
<h4>Our Scope</h4>
<ul>
<li>R&amp;D Survey</li>
<li>Tree Protection</li>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition</li>
<li>Crush &amp; Stockpile</li>
</ul>
<h4>&nbsp;</h4>
<h4>Challenges:</h4>
<p>We faced a few challenges on this project mainly due to the surrounding area. A reserved woodland bounded the eastern side of the site and the other three sides were bounded by properties. These had to be at the forefront of our methodology and logistical planning.</p>
<h4>Solutions:</h4>
<p>To overcome these challenges we sent our Dustboss to site to ensure all processing was fully suppressed. We also had to work closely with our suppliers to avoid certain times during the day when deliveries / collections were required to minimise disruption in the local area. This method was also implemented to any noisy works onsite.</p>
<p>This project was completed three days before expected completion.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/147/Oak-Hill-Grove</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|147&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg865627a51b&amp;ft1542628553&amp;Photo11-09-20181511571.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>White Horse Complex</title>
<guid isPermaLink="false">greenfield_137007</guid>
<pubDate>Tue, 24 Jul 2018 14:49:59 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Bunn Leisure</p>
<h4>Site:</h4>
<p>White Horse Complex, Paddock Lane, Selsey</p>
<h4><span style="text-decoration: underline;">Our Role</span></h4>
<p>Greenfield Demolition was awarded the demolition and asbestos removal works at Bunn Leisure, Selsey's White Horse Complex. This was the second part of Bunn Leisure's facility upgrade that Greenfield had been a part of.&nbsp;</p>
<p>Like previously, the park was to remain live albeit the back end of the holiday season.</p>
<h4><span style="text-decoration: underline;">Our Scope</span></h4>
<ul>
<li>Asbestos Removal (notifiable)</li>
<li>Asbestos Removal (non-notifiable)</li>
<li>Soft Strip</li>
<li>Demolition of all buildings (Storage Units, Club House, Swimming Pool Building, and Entertainment Facility)</li>
<li>Crush all arisings and stockpile onsite</li>
</ul>
<h4><br />Challenges:</h4>
<p>The greatest challenge for this project was the timescale. The complex was to be demolished in 8 weeks including the removal of AIB and asbestos cement. Not only was this Greenfield's largest project, at the time, Greenfield were extremely busy.</p>
<h4>Solutions:</h4>
<p>Greenfield invested in more plant and sourced local, trained and experienced labour. We completed the works within the projected program.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/106/White-Horse-Complex</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|106&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga5a882353a&amp;ft1542211950&amp;BunnLeisure.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Britannia Wharf</title>
<guid isPermaLink="false">greenfield_137006</guid>
<pubDate>Tue, 24 Jul 2018 14:27:43 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Deepwood Properties</p>
<h4>Site:</h4>
<p>Britannia Wharf, Monument Way, Woking</p>
<h4>Our Role:</h4>
<p>Greenfield Demolition was awarded the demolition package by Deepwood Properties to act as Principal Contractor. This was our first project for Deepwood.</p>
<h4>Our Scope:</h4>
<ul>
<li>R + D Survey</li>
<li>Remove fly-tipped waste</li>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition down to basement level</li>
<li>Remove all arising from site</li>
</ul>
<p>&nbsp;</p>
<p>This was a prestigious project for Greenfield. A four storey 2,500m<sup>2</sup>&nbsp;footprint building with a basement for underground parking.</p>
<p>The building was situated adjacent the Saturn Trail canal which bounded the southern boundary and Horsell Common Conservation Park bounded the others.</p>
<p>Our first operation was to remove the fly-tipped waste from site which was left by people whom broke into the site prior to commencement of the works. We undertook this work throughout the day to keep cost down for the client. A soft strip was carried out in unison by another team to ensure the program was not affected.&nbsp;</p>
<p>The buildings interceptors were turned off when the offices were closed and this led to flooding in the basement. Greenfield worked closely with Deepwood to pump out and dispose of the excess water.</p>
<p>Greenfield managed to recycle 99.6% of all waste arising.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/105/Britannia-Wharf</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|105&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0ed580994a&amp;ft1542887858&amp;BW1-2018-06-19-14-58-16.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Albion Road</title>
<guid isPermaLink="false">greenfield_137460</guid>
<pubDate>Tue, 24 Jul 2018 14:27:43 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Britaniacrest Recycling</p>
<h4>Site:</h4>
<p>Albion Road, Reigate</p>
<h4>Our Role:</h4>
<p>Greenfield Demolition was awarded the demolition works as subcontractor working alongside one of our key suppliers and client Britaniacrest Recycling. We have worked with Britaniacrest since 2003.</p>
<h4>Our Scope:</h4>
<ul>
<li>R + D Survey</li>
<li>Soft Strip</li>
<li>Demolition of Office</li>
<li>Removal of Boundary Wall</li>
<li>Removal of Car Park</li>
<li>All Waste removed by Britaniacrest</li>
</ul>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/150/Albion-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|150&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg599b0bc445&amp;ft1542886647&amp;AlbionRoad.png" length="100" type="image/jpg" />
</item>
<item>
<title>Bunn Leisure, Selsey</title>
<guid isPermaLink="false">greenfield_137003</guid>
<pubDate>Mon, 09 Jul 2018 13:49:14 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the demolition works at Selsey Resort by Bunn Leisure to demolish three warehouses to provide an area for parking and mobile homes. This job was to be completed over one phase and we acted as subcontractor.</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Crush all arisings on site</li>
<li>Move crushed arising to White Horse development area</li>
</ul>
<p>&nbsp;</p>
<h4><u>Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out during the back end of the holiday season. Great consideration had to go into the traffic management and noise reductions as not to affect the holiday resort.</p>
<p>&nbsp;</p>
<h4><u>Solutions</u></h4>
<p>Greenfield worked closely with Bunn Leisure&rsquo;s site manager pre-start to assess the busiest times leading up to the project start. We concluded that set delivery and collection times were to be implemented. Greenfield, where possible grubbed up the slab and foundations using a bucket and had set times to break the aggregate into manageable pieces.</p>
<h4>Project Review</h4>
<table style="height: 188px; width: 238px;">
<tbody>
<tr>
<td style="width: 78.0078px;">Client:&nbsp;</td>
<td style="width: 151.758px;">Bunn Leisure</td>
</tr>
<tr>
<td style="width: 78.0078px;">Location:</td>
<td style="width: 151.758px;">Selsey, West Sussex</td>
</tr>
<tr>
<td style="width: 78.0078px;">Start:</td>
<td style="width: 151.758px;">
<p>September 2016</p>
</td>
</tr>
<tr>
<td style="width: 78.0078px;">Complete:&nbsp;</td>
<td style="width: 151.758px;">September 2016</td>
</tr>
</tbody>
</table>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/102/Bunn-Leisure-Selsey</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|102&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg551628d732&amp;ft1542211949&amp;SiteView.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>South Street, Romford</title>
<guid isPermaLink="false">greenfield_137002</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was employed by IC Construction to undertake the demolition works at 64 South Street, Romford. The building was a former nightclub and in mid-terrace with two very busy retail/financial stores either side. The building was to be demolished behind the front facade making way for a residential and commercial development.</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Separations</li>
<li>Hand Demolition to the rear of the site</li>
<li>Demolition</li>
<li>Remove slab and foundations</li>
<li>Crush hardcore and concrete arisings and stockpile</li>
<li>Reduced dig to create basement area (clear from site)<br />&nbsp;</li>
</ul>
<h4><u>Challenge</u>:</h4>
<p>Greenfield&rsquo;s biggest challenge on this project was later on in the project. With the crushed material being reused by the client in the early stages of construction, Greenfield had to mobilise around a tight site during the reduced dig.&nbsp;</p>
<h4><span style="text-decoration: underline;">Solutions:</span></h4>
<p>To enable us to reduce this challenge, Greenfield swapped one of our larger 22t Excavator for one of our smaller 13t Excavators. We have grown strong working relationships with local suppliers in and around the South East and worked closely with the haulage company to enable the amount of inert material that was being excavated being stockpiled</p>
<h4>Project Review</h4>
<table style="height: 120px; width: 265px;">
<tbody>
<tr>
<td style="width: 89px;">Client:</td>
<td style="width: 169px;">I C Construction</td>
</tr>
<tr>
<td style="width: 89px;">Location:</td>
<td style="width: 169px;">Romford, Essex</td>
</tr>
<tr>
<td style="width: 89px;">Start:</td>
<td style="width: 169px;">April 2016</td>
</tr>
<tr>
<td style="width: 89px;">Completed:</td>
<td style="width: 169px;">July 2017</td>
</tr>
<tr>
<td style="width: 89px;">Phases:</td>
<td style="width: 169px;">Four</td>
</tr>
<tr>
<td style="width: 89px;">Recycled:</td>
<td style="width: 169px;">99%</td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/101/South-Street-Romford</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|101&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg01ed616491&amp;ft1542211949&amp;IMG-20160720-WA000.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Fitzpatrick Referrals, Godalming</title>
<guid isPermaLink="false">greenfield_137001</guid>
<pubDate>Fri, 06 Jul 2018 15:02:25 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the demolition works at Godalming by Buxton Building Contractors to demolish a commercial barn used as a vet practice to make way for a modern facility. This job is to be completed over one phase and we are to act as a Subcontractor.</p>
<p>This was our first project for Buxton Building Contractors</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip Out</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove all arisings from site</li>
</ul>
<p>&nbsp;</p>
<h4><u>Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out on a live veterinary practice. Great consideration had to go into the traffic management and noise reductions as not to affect the practice. We also had to take into consideration working whilst filming was being undertaken for a tv show</p>
<h4><u>Solutions</u></h4>
<p>Greenfield worked closely with Buxton&rsquo;s site manager and the Client pre-commencement to assess the busiest times leading up to the project start. Greenfield, where possible grubbed up the slab and foundations using a bucket and had set times to break the aggregate into manageable pieces. Tool box talks were also undertaken regarding noise reduction/ monitoring and taking into consideration neighbouring buildings.</p>
<h4>Project Overview</h4>
<p><strong>Client:</strong> Buxton Building<br /><strong>Location:</strong> Godalming, Surrey<br /><strong>Start:</strong> January 2017<br /><strong>Complete:</strong> February 2017<br /><strong>Recycled:</strong> 95%</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/100/Fitzpatrick-Referrals-Godalming</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|100&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga0b33cb3bd&amp;ft1542211949&amp;IMG_0099.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Brighton Road, South Croydon</title>
<guid isPermaLink="false">greenfield_137495</guid>
<pubDate>Fri, 06 Jul 2018 14:21:46 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition have been awarded the demolition works at South Croydon by Selsdon Building to demolish Car Showroom and ancillary buildings. This job is to be completed over one phase and we are to act as a Subcontractor.</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Separation Works</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove Underground tanks</li>
<li>Remove arisings<br /><br /></li>
</ul>
<h4><u>Challenges</u></h4>
<p>The main challenge on this project was the separation works between neighbouring properties adjoining each side of the site</p>
<h4><u>Solution</u></h4>
<p>Using trained operatives and working closely with Selsdon and both neighbours adjoining, Greenfield carried out the separation works using hand tools, working off mobile towers. All operatives are IPAF and PASMA certified. We also worked closely with the structural design team to ensure all the correct propping was in place.</p>
<h4><span style="text-decoration: underline;">Project Review</span></h4>
<p>Client: Selsdon Building<br />Location: South Croydon<br />Start: October 2016<br />Finish: November 2016<br />Program: 7 weeks<br />Recycled: 99%<br /><br />Our Plant Used:</p>
<ul>
<li>22t Excavator</li>
<li>13t Excavator</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/151/Brighton-Road-South-Croydon</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|151&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3b8505f0bc&amp;ft1542979396&amp;IMG-20160831-WA012.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Leaden Hill Industrial Estate, Coulsdon</title>
<guid isPermaLink="false">greenfield_137496</guid>
<pubDate>Fri, 06 Jul 2018 14:21:46 +0100</pubDate>
<description><![CDATA[<h4><u></u><u>Client:</u></h4>
<h6>The Oakwood Group</h6>
<h4><u>Site:</u></h4>
<p>Leaden Hill Industrial Estate, Coulsdon</p>
<h4><u>Our Role:</u></h4>
<p>Greenfield Demolition were awarded the demolition work by The Oakwood Group. This would be our third project awarded by Oakwood.</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolish all buildings</li>
<li>Crush all aggregate arising</li>
</ul>
<p>&nbsp;</p>
<p>This site consisted of six units, all of different sizes, ranging from 70m<sup>2</sup> to 600m<sup>2</sup>. The site was adjacent to Coulsdon Town Train Station, with the two main warehouses sitting within 1.5m of the platform. With all boundaries of the site being associated with Network Rail property, we had to work closely with The Oakwood Group and Network Rail to come up with a suitable method which would not affect the live platform area.</p>
<p>We worked closely with local suppliers to ensure minimal disruption was caused during access to Coulsdon Town Train Station. We employed a watchman to stand on the platform to liaise with the site supervisor to communicate when the platform was busy so works could be suspended until passengers got on the train. This process continued until all sheets were removed from the roof and the wall was lowered to below the boundary fence. Once this was completed our 45t Excavator and our two 22t excavators completed the demolition contract.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/152/Leaden-Hill-Industrial-Estate-Coulsdon</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|152&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2f0ae20ebf&amp;ft1542980976&amp;LeadenHillIndEst52018-03-22-PHOTO-00000096.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Avonley Road, Phase 1</title>
<guid isPermaLink="false">greenfield_137004</guid>
<pubDate>Mon, 25 Jun 2018 13:24:37 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bespoke Modular Developments Ltd</p>
<h2>Location</h2>
<p>New Cross</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded as sub-contractor to undertake the demolition works at the former MOT/Garage site in New Cross for our second project for Bespoke Modular Developments Ltd.</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip (including separations)</li>
<li>Demolition (full)</li>
<li>Slab and Foundation Removal</li>
<li>Crush Arisings and Stockpile</li>
</ul>
<h2><br />Challenges</h2>
<p>Our biggest challenge at New Cross was the close proximity to the surrounding neighbouring buildings. Each of the four buildings, three of which were removed in phase 1, had to be carefully demolished/dismantled on the boundary walls. This took one of our most experienced teams to complete within three weeks ahead of program.</p>
<p>Phase two is set to commence late 2018 which will bring a more complex method of demolition with the building being structurally weak.&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/103/Avonley-Road-Phase-1</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|103&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf548c9b6fc&amp;ft1542211949&amp;AvonleyRoad2.jpeg" length="100" type="image/jpg" />
</item>
<item>
<title>64 South Street, Romford</title>
<guid isPermaLink="false">greenfield_84854</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition have been employed by IC Construction to undertake the demolition works at 64 South Street, Romford. The building was a former nightclub and in mid-terrace with two very busy retail/financial stores either side.</span></p>
<h4 class="p1"><span class="s1">Our Scope:</span></h4>
<ul>
<li class="p1"><span class="s1">Demolition of Building</span></li>
<li class="p1"><span class="s1">Remove Slab and Foundations</span></li>
<li class="p1"><span class="s1">Crush all arisings on site</span></li>
<li class="p1"><span class="s1">Fa&ccedil;ade is to remain in situ </span></li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/59/64-South-Street-Romford</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|59&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg01ed616491&amp;ft1469530774&amp;IMG-20160720-WA000.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Homebase, Stevenage</title>
<guid isPermaLink="false">greenfield_137009</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed by Faircloth Construction to undertake the demolition works of a Homebase, Roaring Meg Retail Park, Stevenage. Greenfield Demolitions scope of works was to disconnect services, strip out warehouse, demolish, grub out slab and foundations and crush all arisings on site</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge Greenfield Demolition had to contend with was the close proximity of the neighbouring store. The neighbouring store was situated within 4 metres of the Homebase store.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">Greenfield overcame this challenge under close supervision and a watchman. We also used our highly experienced machine operator who used a grab attachment to carefully bring the panels safely in a controlled manner into the site.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/108/Homebase-Stevenage</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|108&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3ca2e61e72&amp;ft1542211950&amp;IMG-20160720-WA010.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Former REL Office, Bracknell</title>
<guid isPermaLink="false">greenfield_137010</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed as a principal contractor by Hodson Developments to demolish a standalone office building. Our scope was to erect hoarding gates for delivery and pedestrian gates, remove asbestos, strip out, demolish, remove slab and foundations, grub up car park area and remove all arisings from site.</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge on this project was the program being 5 weeks. The building being a two storey 3000m&sup2; and the car park area to the rear of the office building another 1000m&sup2;.</span></p>
<p class="p1"><span class="s1">The second challenge was the asbestos to the warehouse roof.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">To overcome these challenges, we allocated 90% of our site staff to this project.</span></p>
<p class="p1"><span class="s1">The asbestos roof had to be brought down with the machine. We had exclusions zones and drop zones in place and prior to the removal with had suppressed the sheets with water. We carefully lowered the sheets to ground level straight into a roll on/off bin which was then taken into a licenced waste facility.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/109/Former-REL-Office-Bracknell</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|109&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg80d4abd498&amp;ft1542211950&amp;IMG-20160720-WA035.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Meadowbanks, Dorking</title>
<guid isPermaLink="false">greenfield_137011</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed by Mole Valley District Council to undertake the demolition works as Principal Contractor to demolish football stands, clubhouse buildings, along with ancillary buildings and shelter/ dug outs. All the slab, pathways and foundations were grubbed up and all arisings carted away.</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge on this project was we had to ensure minimal damage was caused to the current football pitch, doing so mid-winter where the ground was very wet.</span></p>
<p class="p1"><span class="s1">When grubbing up the pathways around the pitch we uncovered broken asbestos.</span></p>
<p class="p1"><span class="s1">Further to this, it was a contentious project with mixed support from the public. Meadowbanks had been a football club since the late 19</span><span class="s3"><sup>th</sup></span><span class="s1"> Century. We also had to be wary of noise created due to the surrounding offices.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">To prevent damage when removing the dug outs, we laid track pads to move machinery across the pitch.</span></p>
<p class="p1"><span class="s1">When the asbestos was discovered we first had our team to test the type of asbestos that was present. The results came back as cement bonded which with the correct PPE and suits was placed into asbestos bags and taken to a licenced waste facility.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/110/Meadowbanks-Dorking</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|110&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga03514a949&amp;ft1542211951&amp;IMG_2786.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Toys’R’Us, Stevenage</title>
<guid isPermaLink="false">greenfield_137012</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed to undertake the demolition works of a Toys&rsquo;R&rsquo;Us store in Stevenage. This was our second project for Faircloth in Roaring Meg Retail Park. </span></p>
<p class="p1"><span class="s1">The Toys&rsquo;R&rsquo;Us store was to be demolished, the slabs and foundations removed with all concrete arisings to be crushed on site and left for re-use for the new build.</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge was that the Toys&rsquo;R&rsquo;Us store was adjoined to a neighbouring store.</span></p>
<p class="p1"><span class="s1">Further to this, being in a retail park we had to take into consideration noise and vibrations when undertaking the demolition, especially breaking out the slab and foundations.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">Using a different method to a standalone building, Greenfield used various techniques to reduce vibrations affecting the neighbouring store. </span></p>
<p class="p1"><span class="s1"> The bay adjoining the store was the highest risk point so to overcome the challenge of the beams, Greenfield used an excavator and grab attachment to hold the beam in place to act as a temporary prop. An operative then cut through the beam with the burning gear. With the machine still in place, the 45t with sheer cut through at the middle of the bay enabling the other operator to lower the beam safely to the ground in a controlled manner. </span></p>
<p class="p1"><span class="s1"> When it came to removing the slab, operative saw cut a line 1 metre away from the adjoining store into the slab. This helped to remove the slab without causing disturbance to the neighbouring store.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/111/ToysRUs-Stevenage</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|111&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgc7cc9dd45b&amp;ft1542211951&amp;20160225_114600.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>B&amp;Q, Rochester</title>
<guid isPermaLink="false">greenfield_137013</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p>Greenfield Demolition was employed to undertake the asbestos removal and demolition works of a B&amp;Q Store at Strood Retail Park. We used a subcontractor who have worked alongside us for ten years and remove 3500m&sup2; of roof sheets from the retail store. Following the removal of the asbestos, Greenfield Demolition stripped and demolished the B&amp;Q Store, removed slab and foundations and crush all hardcore arisings, stockpile and leave on site.</p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p>The main challenge was that the B&amp;Q store was adjoined to a neighbouring store.</p>
<p>Further to this, being in a retail park we had to take into consideration noise and vibrations when undertaking the demolition, especially breaking out the slab and foundations.</p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p>Using a different method to a standalone building, Greenfield used various techniques to reduce vibrations affecting the neighbouring store.</p>
<p>The bay adjoining the store was the highest risk point so to overcome the challenge of the beams, Greenfield used an excavator and grab attachment to hold the beam in place to act as a temporary prop. An operative then cut through the beam with the burning gear. With the machine still in place, the 45t with sheer cut through at the middle of the bay enabling the other operator to lower the beam safely to the ground.</p>
<p>When it came to removing the slab, operative saw cut a line 1 metre away from the adjoining store into the slab. This helped to remove the slab without causing disturbance to the neighbouring store.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/112/BQ-Rochester</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|112&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf3eabfd624&amp;ft1542211951&amp;IMG-20160421-WA005.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Heathermount School, Ascot</title>
<guid isPermaLink="false">greenfield_137014</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p>Greenfield Demolition were awarded the demolition works at Heathermount School by Beard Guildford to demolish a caretakers shed, two houses and removal of a slab. This job is to be completed over two phases</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove all arisings from site</li>
</ul>
<p>The first phase Greenfield was employed to demolish the caretakers workshop and break out and remove the slab where a former building was situated.</p>
<p>The second phase consisted of the demolition of the two houses. This phase also consisted of removal of notifiable asbestos, slab and foundation removal and clear all materials from site.</p>
<h4><strong>Challenges</strong></h4>
<p>The biggest challenge on this project was during the first phase where the school remained live.</p>
<p>During the second phase the program was one week to enable the project being completed before the start of school.</p>
<h4><strong>Solutions</strong></h4>
<p>Greenfield Demolition worked closely with Beard and had a safe system procedure. All site personnel were to stop works immediately if a pupil was to enter the site. A school official would escort the pupil off site and then work would continue</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/113/Heathermount-School-Ascot</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|113&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf9afc5b4a0&amp;ft1542211951&amp;HeathermountSchool.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Reigate Business Mews, Reigate</title>
<guid isPermaLink="false">greenfield_161198</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p>Greenfield Demolition was employed by Smallworld UK to undertake the demolition works of an office in Reigate. Our scope was to strip out, demolish, remove slab and foundations and remove all arisings from site.</p>
<h4>Challenges</h4>
<p>The main challenge on this project was the neighbouring buildings owner whom had a lot uncertainties and under knowledge with demolition.</p>
<h4>Solutions</h4>
<p>Our supervisor spoke with the neighbour to talk about methods of work and how we would cause minimal disturbance as possible. To create minimal disturbance Greenfield Demolition had one labourer directing a hose on the area of operation to minimise dust. We also used a dust buster machine for the overall site to create less arising dust.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/155/Reigate-Business-Mews-Reigate</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|155&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5b147cd023&amp;ft1572016633&amp;IMG-20160720-WA049.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>