<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/208/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Fri, 30 Aug 2024 15:05:14 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title></title>
<guid isPermaLink="false">greenfield_193970</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/163/Hockley-Industrial-Estate</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|163&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg743f8a05f9&amp;ft1725026986&amp;Picture3.1.1.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Harley Street and Wigmore Place</title>
<guid isPermaLink="false">greenfield_137019</guid>
<pubDate>Tue, 24 Jul 2018 15:17:31 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Buxton Building Contractors</p>
<h4>Site:</h4>
<p>Harley Street and Wigmore Place, Marylebone</p>
<h4>Our Role</h4>
<p>Greenfield Demolition were awarded the subcontract package for Buxton Building Contractors. This was our fourth project awarded by Buxton in the space of twelve months.</p>
<p>The works included the strip out and alterations of the Grade II listed building in the heart of London.</p>
<h4>Our Scope</h4>
<ul>
<li>Strip out both structures</li>
<li>Create openings</li>
<li>Demolition of the link building between Harley Street and Wigmore Place</li>
<li>Removal of the roof of Wigmore Place</li>
</ul>
<h4>&nbsp;</h4>
<h4>Challenges:</h4>
<p>There were multiple challenges throughout this project. Site logistics, multiple trades, program, contaminated waste, to name a few.</p>
<h4>Solutions:</h4>
<p>Prior to the project commencing Greenfield representatives worked closely with local suppliers regarding site logistics (delivery and collection times). Greenfield was given a one week head start before following trades started coming on to site so that Buxton were able to achieve their program.&nbsp;</p>
<p>This project was a great way to start 2018 in such a prestigious area of London.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/118/Harley-Street-and-Wigmore-Place</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|118&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5be72b1ead&amp;ft1542211984&amp;2018-01-15-PHOTO-00000006.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Aldi Store, Peterborough</title>
<guid isPermaLink="false">greenfield_137403</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4>Client:&nbsp;</h4>
<p>Camford Construction Management</p>
<h4>Location:</h4>
<p>Peterborough</p>
<h4>Our Role:</h4>
<p>Sub-Contractor</p>
<h4>Summary:</h4>
<p>Strip out and Alterations for new Aldi Store</p>
<h4>Scope:</h4>
<p>&bull; Removal of cladding from front elevation<br />&bull; Removal of block work wall from front elevation<br />&bull; Remove roller shutter door<br />&bull; Removal of fascia capping and set aside for reuse<br />&bull; Clear all arisings from site</p>
<h4>Program:</h4>
<p>5 days</p>
<h4>Recycling:</h4>
<p>100%<br /><br /></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/148/Aldi-Store-Peterborough</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|148&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgb9ce7d80a0&amp;ft1582279673&amp;d9a23dd0-402a-4742-a4ae-0e50c73df5a8.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Aldi Store, Upminster</title>
<guid isPermaLink="false">greenfield_165617</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4>Client:&nbsp;</h4>
<p>Camford Construction Management</p>
<h4>Site:</h4>
<p>Aldi Store, St Mary's Lane, Upminster, London</p>
<p>Our Role:</p>
<p>Greenfield Demolition was awarded the strip out works by Camford to act as subcontractor. This would be our fifth project for DSP / Camford.</p>
<h4>Scope:</h4>
<ul>
<li>Strip out store back to shell</li>
<li>De-gas and remove refrigeration units<br />&nbsp;</li>
</ul>
<h4>Challenge:</h4>
<p>The greatest challenge we faced on this project was the time frame given for our program. We had two weeks to get the store stripped back to it's shell as Aldi required the shop to be live as soon as possible.&nbsp;</p>
<h4>Solutions:</h4>
<p>We opted to use a skidsteer and 3t excavator to do the bulk of the heavy work to reduce the risk of manual handling.We employed local labour to enable us to work longer shifts and help push the project along. We completed the project on time and within budget.</p>
<h4>&nbsp;</h4>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/158/Aldi-Store-Upminster</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|158&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg7e5c1c1b2d&amp;ft1582279391&amp;AldiPhoto31-07-20182132293.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>The Orchards Shopping Centre, Haywards Heath</title>
<guid isPermaLink="false">greenfield_137017</guid>
<pubDate>Mon, 09 Jul 2018 12:55:24 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the strip out and alterations contract by RB Construction for Unit 20 &amp; 21 The Orchard Shopping Centre where the two units will be merged into one.</p>
<p>This is the third contract completed for R&amp;B Construction Group</p>
<h4>Our Scope:</h4>
<ul>
<li>Carry out the soft strip</li>
<li>Partial Removal of wall</li>
<li>Remove part of the existing load bearing wall</li>
<li>Form openings</li>
<li>Saw cut the existing slab</li>
<li>Break out remainder of load bearing wall</li>
</ul>
<p>&nbsp;</p>
<h4>Project Review</h4>
<table style="width: 311px;">
<tbody>
<tr>
<td style="width: 85px;">Client:</td>
<td style="width: 240px;">RB Construction</td>
</tr>
<tr>
<td style="width: 85px;">Location:</td>
<td style="width: 240px;">Hayward Heath, West Sussex</td>
</tr>
<tr>
<td style="width: 85px;">Start:</td>
<td style="width: 240px;">September 2016</td>
</tr>
<tr>
<td style="width: 85px;">Finish:</td>
<td style="width: 240px;">September 2016</td>
</tr>
<tr>
<td style="width: 85px;">Program:</td>
<td style="width: 240px;">2 weeks</td>
</tr>
</tbody>
</table>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/116/The-Orchards-Shopping-Centre-Haywards-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|116&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0c1abadfb6&amp;ft1542211984&amp;IMG-20160831-WA010.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Elthorne Primary School, London</title>
<guid isPermaLink="false">greenfield_137016</guid>
<pubDate>Mon, 09 Jul 2018 12:21:34 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the strip out works at Elthorne Primary School by Jerram Falkus Construction to strip a classroom block at a school in Hanwell. This job was to be completed over one phase and we acted as a subcontractor.</p>
<p>This was our first project for Jerram Falkus Construction</p>
<h4>Our Scope:</h4>
<ul>
<li>Strip out classrooms</li>
<li>Remove partitioning walls</li>
<li>Remove windows and doors</li>
<li>Remove ceilings</li>
<li>Remove M&amp;E equipment</li>
</ul>
<h4><u><br />Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out on a live school. We had a very tight time-frame to complete our works to allow Jerram to undertake their main works during the school holidays.</p>
<h4><u>Solutions</u></h4>
<p>Greenfield sourced trained local labour to enable us to complete the strip out of the classroom block in the three-day period. Greenfield sourced local suppliers who were able to remove the waste when required and make deliveries accordingly too.</p>
<h4>Project Review:</h4>
<table style="height: 132px;" width="257">
<tbody>
<tr>
<td style="width: 124.258px;">Client:</td>
<td style="width: 124.258px;">Jerram Falkus</td>
</tr>
<tr>
<td style="width: 124.258px;">Location:</td>
<td style="width: 124.258px;">Hanwell, London</td>
</tr>
<tr>
<td style="width: 124.258px;">Start:</td>
<td style="width: 124.258px;">July 2017</td>
</tr>
<tr>
<td style="width: 124.258px;">Complete:</td>
<td style="width: 124.258px;">July 2017</td>
</tr>
<tr>
<td style="width: 124.258px;">Recycled:</td>
<td style="width: 124.258px;">97%</td>
</tr>
</tbody>
</table>
<p>&nbsp;<br />&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/115/Elthorne-PS-London</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|115&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5c8f72b9e2&amp;ft1542211984&amp;ElthornePark2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Limpsfield Road</title>
<guid isPermaLink="false">greenfield_137005</guid>
<pubDate>Mon, 25 Jun 2018 13:44:40 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bonds Building Contractors Ltd</p>
<h2>Location</h2>
<p>Warlingham</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded the demolition package as sub-contractor for the development works at Limpsfield Road, Warlingham by Bonds Builders. This is our first project for Bonds Builders.</p>
<h2>Program</h2>
<p>8 Weeks</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition</li>
<li>Remove Slab and Foundations</li>
<li>Crush All Arisings and Stockpile Onsite</li>
<li>Tree Clearance</li>
<li>Tank (underground) Removal</li>
</ul>
<p><br />The site consisted of a car showroom, an MOT/Garage Station, a gym, and a bungalow to the rear of the site.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/104/Limpsfield-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|104&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg93a2e364db&amp;ft1542211950&amp;WarlinghamSite.png" length="100" type="image/jpg" />
</item>
<item>
<title>Avonley Road, Phase 1</title>
<guid isPermaLink="false">greenfield_137004</guid>
<pubDate>Mon, 25 Jun 2018 13:24:37 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bespoke Modular Developments Ltd</p>
<h2>Location</h2>
<p>New Cross</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded as sub-contractor to undertake the demolition works at the former MOT/Garage site in New Cross for our second project for Bespoke Modular Developments Ltd.</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip (including separations)</li>
<li>Demolition (full)</li>
<li>Slab and Foundation Removal</li>
<li>Crush Arisings and Stockpile</li>
</ul>
<h2><br />Challenges</h2>
<p>Our biggest challenge at New Cross was the close proximity to the surrounding neighbouring buildings. Each of the four buildings, three of which were removed in phase 1, had to be carefully demolished/dismantled on the boundary walls. This took one of our most experienced teams to complete within three weeks ahead of program.</p>
<p>Phase two is set to commence late 2018 which will bring a more complex method of demolition with the building being structurally weak.&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/103/Avonley-Road-Phase-1</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|103&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf548c9b6fc&amp;ft1542211949&amp;AvonleyRoad2.jpeg" length="100" type="image/jpg" />
</item>
<item>
<title>Lok’N’Store, Millbrook</title>
<guid isPermaLink="false">greenfield_84856</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition have been awarded the strip out contract by Camistar for the Former Lok&rsquo;n&rsquo;Store storage three-storey building which is to be converted into a Park&rsquo;n&rsquo;Cruise. </span></p>
<h4 class="p1"><span class="s1">Our Scope:</span></h4>
<ul>
<li class="p1"><span class="s1">Strip and Remove all lighting</span></li>
<li class="p1"><span class="s1">Strip and Remove all ceilings and mechanical equipment</span></li>
<li class="p1"><span class="s1">Dismantle and Remove all Lifts and Lift Shafts</span></li>
<li class="p1"><span class="s1">Strip and Remove all plasterboard walls</span></li>
<li class="p1"><span class="s1">Dismantle and Remove roller doors and dock levellers</span></li>
<li class="p1"><span class="s1">Remove all arising from site </span></li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/61/LokNStore-Millbrook</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|61&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2c43245fc3&amp;ft1469531392&amp;LokNStore-Millbrook.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Hayworthe Villa</title>
<guid isPermaLink="false">greenfield_137008</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<p><span style="text-decoration: underline;"><strong>Client</strong></span>&nbsp; &nbsp;&nbsp;</p>
<p>Sunninghill Construction Co. Ltd<br /><br /><span style="text-decoration: underline;"><strong>Location</strong></span></p>
<p>Haywards Heath<br /><br /><span style="text-decoration: underline;"><strong>Our Role</strong></span></p>
<p>Sub-Contractor<br /><br /><strong><span style="text-decoration: underline;">Summary</span></strong></p>
<p>Strip out works in large office space<br /><br /><strong><span style="text-decoration: underline;">Scope</span>:&nbsp;</strong></p>
<ul>
<li>Remove Partitions</li>
<li>Strip out ceilings</li>
<li>Remove floor coverings</li>
<li>Remove Porch</li>
<li>Remove WCs and Basins</li>
<li>Remove Walls and Tilings</li>
<li>Remove Boilers and Associated Heating System</li>
<li>Remove Kitchen</li>
<li>Form Openings</li>
<li>Remove stair coverings and nosings</li>
</ul>
<p><br /><span style="text-decoration: underline;"><strong>Program</strong></span>&nbsp;</p>
<p>12 days</p>
<p><span style="text-decoration: underline;"><strong>Recycling</strong></span></p>
<p>95%</p>
<p><span style="text-decoration: underline;"><strong>Feedback</strong></span></p>
<p>&lsquo;&rsquo;Very Tidy Job. Very Pleased&rsquo;&rsquo;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/107/Hayworthe-Villa</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|107&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf85bc5b915&amp;ft1572017305&amp;PHOTO-2019-09-11-13-15-35.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Homebase, Stevenage</title>
<guid isPermaLink="false">greenfield_137009</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview:</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed by Faircloth Construction to undertake the demolition works of a Homebase, Roaring Meg Retail Park, Stevenage. Greenfield Demolitions scope of works was to disconnect services, strip out warehouse, demolish, grub out slab and foundations and crush all arisings on site</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge Greenfield Demolition had to contend with was the close proximity of the neighbouring store. The neighbouring store was situated within 4 metres of the Homebase store.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">Greenfield overcame this challenge under close supervision and a watchman. We also used our highly experienced machine operator who used a grab attachment to carefully bring the panels safely in a controlled manner into the site.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/108/Homebase-Stevenage</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|108&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3ca2e61e72&amp;ft1542211950&amp;IMG-20160720-WA010.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>