<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/212/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Fri, 30 Aug 2024 15:05:14 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title></title>
<guid isPermaLink="false">greenfield_194039</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/170/Lilford-Business-Centre</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|170&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg7253f448d0&amp;ft1731067053&amp;bannerDemolition2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194091</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/175/Lyons-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|175&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg986f914b1e&amp;ft1728408962&amp;lyonsBottom.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194130</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/199/Lyons-Road---Site-Clearance</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|199&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3bb21317cd&amp;ft1728984661&amp;lyonsClearanceBanner.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_197241</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/215/Bensham-Lane-Thornton-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|215&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg659a11f1b5&amp;ft1769603015&amp;benshamFWBannerExt.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Oak Hill Grove</title>
<guid isPermaLink="false">greenfield_137343</guid>
<pubDate>Tue, 24 Jul 2018 15:17:31 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Croudace Portland</p>
<h4>Site:</h4>
<p>4 Oak Hill Grove, Surbiton</p>
<h4>Our Role</h4>
<p>Greenfield Demolition were awarded the demolition package to act as Principal Contractor. This was our first project for Croudace Portland.</p>
<h4>Our Scope</h4>
<ul>
<li>R&amp;D Survey</li>
<li>Tree Protection</li>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition</li>
<li>Crush &amp; Stockpile</li>
</ul>
<h4>&nbsp;</h4>
<h4>Challenges:</h4>
<p>We faced a few challenges on this project mainly due to the surrounding area. A reserved woodland bounded the eastern side of the site and the other three sides were bounded by properties. These had to be at the forefront of our methodology and logistical planning.</p>
<h4>Solutions:</h4>
<p>To overcome these challenges we sent our Dustboss to site to ensure all processing was fully suppressed. We also had to work closely with our suppliers to avoid certain times during the day when deliveries / collections were required to minimise disruption in the local area. This method was also implemented to any noisy works onsite.</p>
<p>This project was completed three days before expected completion.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/147/Oak-Hill-Grove</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|147&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg865627a51b&amp;ft1542628553&amp;Photo11-09-20181511571.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Peckham Palms, Bournemouth Close, Peckham</title>
<guid isPermaLink="false">greenfield_137451</guid>
<pubDate>Tue, 24 Jul 2018 15:17:31 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Jerram Falkus Construction Ltd</p>
<h4>Site:</h4>
<p>Peckham Palms, Bournemouth Close, Peckham</p>
<h4>Our Role</h4>
<p>Greenfield Demolition were awarded the clearance and landscaping work as subcontractors. This is our second project for Jerram.</p>
<h4>Our Scope</h4>
<ul>
<li>Asbestos Sampling</li>
<li>Environmental Clean</li>
<li>Landscaping</li>
<li>Installation of a footpath</li>
</ul>
<h4>&nbsp;</h4>
<p>Greenfield Demolition were called on to mobilise quick mid-project for Jerram Falkus. Suspected asbestos was discovered beneath the slab.</p>
<p>Our surveyor sampled and confirmed the suspected asbestos as cement chrysotile.</p>
<p>Greenfield's NNLW trained asbestos operatives carried out an environmental clean which all waste was taken to a licensed facility for landfill.&nbsp;</p>
<p>Following the environmental clean, our groundwork team scraped the site ready to install the footpath to what would e the new housing development.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/149/Peckham-Palms-Bournemouth-Close</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|149&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga06917b5e9&amp;ft1542802857&amp;BournemouthClose1.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>White Horse Complex</title>
<guid isPermaLink="false">greenfield_137007</guid>
<pubDate>Tue, 24 Jul 2018 14:49:59 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Bunn Leisure</p>
<h4>Site:</h4>
<p>White Horse Complex, Paddock Lane, Selsey</p>
<h4><span style="text-decoration: underline;">Our Role</span></h4>
<p>Greenfield Demolition was awarded the demolition and asbestos removal works at Bunn Leisure, Selsey's White Horse Complex. This was the second part of Bunn Leisure's facility upgrade that Greenfield had been a part of.&nbsp;</p>
<p>Like previously, the park was to remain live albeit the back end of the holiday season.</p>
<h4><span style="text-decoration: underline;">Our Scope</span></h4>
<ul>
<li>Asbestos Removal (notifiable)</li>
<li>Asbestos Removal (non-notifiable)</li>
<li>Soft Strip</li>
<li>Demolition of all buildings (Storage Units, Club House, Swimming Pool Building, and Entertainment Facility)</li>
<li>Crush all arisings and stockpile onsite</li>
</ul>
<h4><br />Challenges:</h4>
<p>The greatest challenge for this project was the timescale. The complex was to be demolished in 8 weeks including the removal of AIB and asbestos cement. Not only was this Greenfield's largest project, at the time, Greenfield were extremely busy.</p>
<h4>Solutions:</h4>
<p>Greenfield invested in more plant and sourced local, trained and experienced labour. We completed the works within the projected program.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/106/White-Horse-Complex</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|106&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga5a882353a&amp;ft1542211950&amp;BunnLeisure.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Britannia Wharf</title>
<guid isPermaLink="false">greenfield_137006</guid>
<pubDate>Tue, 24 Jul 2018 14:27:43 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Deepwood Properties</p>
<h4>Site:</h4>
<p>Britannia Wharf, Monument Way, Woking</p>
<h4>Our Role:</h4>
<p>Greenfield Demolition was awarded the demolition package by Deepwood Properties to act as Principal Contractor. This was our first project for Deepwood.</p>
<h4>Our Scope:</h4>
<ul>
<li>R + D Survey</li>
<li>Remove fly-tipped waste</li>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition down to basement level</li>
<li>Remove all arising from site</li>
</ul>
<p>&nbsp;</p>
<p>This was a prestigious project for Greenfield. A four storey 2,500m<sup>2</sup>&nbsp;footprint building with a basement for underground parking.</p>
<p>The building was situated adjacent the Saturn Trail canal which bounded the southern boundary and Horsell Common Conservation Park bounded the others.</p>
<p>Our first operation was to remove the fly-tipped waste from site which was left by people whom broke into the site prior to commencement of the works. We undertook this work throughout the day to keep cost down for the client. A soft strip was carried out in unison by another team to ensure the program was not affected.&nbsp;</p>
<p>The buildings interceptors were turned off when the offices were closed and this led to flooding in the basement. Greenfield worked closely with Deepwood to pump out and dispose of the excess water.</p>
<p>Greenfield managed to recycle 99.6% of all waste arising.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/105/Britannia-Wharf</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|105&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0ed580994a&amp;ft1542887858&amp;BW1-2018-06-19-14-58-16.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Bunn Leisure, Selsey</title>
<guid isPermaLink="false">greenfield_137003</guid>
<pubDate>Mon, 09 Jul 2018 13:49:14 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the demolition works at Selsey Resort by Bunn Leisure to demolish three warehouses to provide an area for parking and mobile homes. This job was to be completed over one phase and we acted as subcontractor.</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Crush all arisings on site</li>
<li>Move crushed arising to White Horse development area</li>
</ul>
<p>&nbsp;</p>
<h4><u>Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out during the back end of the holiday season. Great consideration had to go into the traffic management and noise reductions as not to affect the holiday resort.</p>
<p>&nbsp;</p>
<h4><u>Solutions</u></h4>
<p>Greenfield worked closely with Bunn Leisure&rsquo;s site manager pre-start to assess the busiest times leading up to the project start. We concluded that set delivery and collection times were to be implemented. Greenfield, where possible grubbed up the slab and foundations using a bucket and had set times to break the aggregate into manageable pieces.</p>
<h4>Project Review</h4>
<table style="height: 188px; width: 238px;">
<tbody>
<tr>
<td style="width: 78.0078px;">Client:&nbsp;</td>
<td style="width: 151.758px;">Bunn Leisure</td>
</tr>
<tr>
<td style="width: 78.0078px;">Location:</td>
<td style="width: 151.758px;">Selsey, West Sussex</td>
</tr>
<tr>
<td style="width: 78.0078px;">Start:</td>
<td style="width: 151.758px;">
<p>September 2016</p>
</td>
</tr>
<tr>
<td style="width: 78.0078px;">Complete:&nbsp;</td>
<td style="width: 151.758px;">September 2016</td>
</tr>
</tbody>
</table>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/102/Bunn-Leisure-Selsey</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|102&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg551628d732&amp;ft1542211949&amp;SiteView.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>South Street, Romford</title>
<guid isPermaLink="false">greenfield_137002</guid>
<pubDate>Mon, 09 Jul 2018 13:07:37 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was employed by IC Construction to undertake the demolition works at 64 South Street, Romford. The building was a former nightclub and in mid-terrace with two very busy retail/financial stores either side. The building was to be demolished behind the front facade making way for a residential and commercial development.</p>
<h4>Our Scope:</h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Separations</li>
<li>Hand Demolition to the rear of the site</li>
<li>Demolition</li>
<li>Remove slab and foundations</li>
<li>Crush hardcore and concrete arisings and stockpile</li>
<li>Reduced dig to create basement area (clear from site)<br />&nbsp;</li>
</ul>
<h4><u>Challenge</u>:</h4>
<p>Greenfield&rsquo;s biggest challenge on this project was later on in the project. With the crushed material being reused by the client in the early stages of construction, Greenfield had to mobilise around a tight site during the reduced dig.&nbsp;</p>
<h4><span style="text-decoration: underline;">Solutions:</span></h4>
<p>To enable us to reduce this challenge, Greenfield swapped one of our larger 22t Excavator for one of our smaller 13t Excavators. We have grown strong working relationships with local suppliers in and around the South East and worked closely with the haulage company to enable the amount of inert material that was being excavated being stockpiled</p>
<h4>Project Review</h4>
<table style="height: 120px; width: 265px;">
<tbody>
<tr>
<td style="width: 89px;">Client:</td>
<td style="width: 169px;">I C Construction</td>
</tr>
<tr>
<td style="width: 89px;">Location:</td>
<td style="width: 169px;">Romford, Essex</td>
</tr>
<tr>
<td style="width: 89px;">Start:</td>
<td style="width: 169px;">April 2016</td>
</tr>
<tr>
<td style="width: 89px;">Completed:</td>
<td style="width: 169px;">July 2017</td>
</tr>
<tr>
<td style="width: 89px;">Phases:</td>
<td style="width: 169px;">Four</td>
</tr>
<tr>
<td style="width: 89px;">Recycled:</td>
<td style="width: 169px;">99%</td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/101/South-Street-Romford</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|101&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg01ed616491&amp;ft1542211949&amp;IMG-20160720-WA000.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Fitzpatrick Referrals, Godalming</title>
<guid isPermaLink="false">greenfield_137001</guid>
<pubDate>Fri, 06 Jul 2018 15:02:25 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition was awarded the demolition works at Godalming by Buxton Building Contractors to demolish a commercial barn used as a vet practice to make way for a modern facility. This job is to be completed over one phase and we are to act as a Subcontractor.</p>
<p>This was our first project for Buxton Building Contractors</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip Out</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove all arisings from site</li>
</ul>
<p>&nbsp;</p>
<h4><u>Challenges</u></h4>
<p>Greenfield&rsquo;s greatest challenge on this project was that the works were carried out on a live veterinary practice. Great consideration had to go into the traffic management and noise reductions as not to affect the practice. We also had to take into consideration working whilst filming was being undertaken for a tv show</p>
<h4><u>Solutions</u></h4>
<p>Greenfield worked closely with Buxton&rsquo;s site manager and the Client pre-commencement to assess the busiest times leading up to the project start. Greenfield, where possible grubbed up the slab and foundations using a bucket and had set times to break the aggregate into manageable pieces. Tool box talks were also undertaken regarding noise reduction/ monitoring and taking into consideration neighbouring buildings.</p>
<h4>Project Overview</h4>
<p><strong>Client:</strong> Buxton Building<br /><strong>Location:</strong> Godalming, Surrey<br /><strong>Start:</strong> January 2017<br /><strong>Complete:</strong> February 2017<br /><strong>Recycled:</strong> 95%</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/100/Fitzpatrick-Referrals-Godalming</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|100&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sga0b33cb3bd&amp;ft1542211949&amp;IMG_0099.JPG" length="100" type="image/jpg" />
</item>
<item>
<title>Brighton Road, South Croydon</title>
<guid isPermaLink="false">greenfield_137495</guid>
<pubDate>Fri, 06 Jul 2018 14:21:46 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition have been awarded the demolition works at South Croydon by Selsdon Building to demolish Car Showroom and ancillary buildings. This job is to be completed over one phase and we are to act as a Subcontractor.</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Separation Works</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove Underground tanks</li>
<li>Remove arisings<br /><br /></li>
</ul>
<h4><u>Challenges</u></h4>
<p>The main challenge on this project was the separation works between neighbouring properties adjoining each side of the site</p>
<h4><u>Solution</u></h4>
<p>Using trained operatives and working closely with Selsdon and both neighbours adjoining, Greenfield carried out the separation works using hand tools, working off mobile towers. All operatives are IPAF and PASMA certified. We also worked closely with the structural design team to ensure all the correct propping was in place.</p>
<h4><span style="text-decoration: underline;">Project Review</span></h4>
<p>Client: Selsdon Building<br />Location: South Croydon<br />Start: October 2016<br />Finish: November 2016<br />Program: 7 weeks<br />Recycled: 99%<br /><br />Our Plant Used:</p>
<ul>
<li>22t Excavator</li>
<li>13t Excavator</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/151/Brighton-Road-South-Croydon</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|151&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3b8505f0bc&amp;ft1542979396&amp;IMG-20160831-WA012.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Limpsfield Road</title>
<guid isPermaLink="false">greenfield_137005</guid>
<pubDate>Mon, 25 Jun 2018 13:44:40 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bonds Building Contractors Ltd</p>
<h2>Location</h2>
<p>Warlingham</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded the demolition package as sub-contractor for the development works at Limpsfield Road, Warlingham by Bonds Builders. This is our first project for Bonds Builders.</p>
<h2>Program</h2>
<p>8 Weeks</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition</li>
<li>Remove Slab and Foundations</li>
<li>Crush All Arisings and Stockpile Onsite</li>
<li>Tree Clearance</li>
<li>Tank (underground) Removal</li>
</ul>
<p><br />The site consisted of a car showroom, an MOT/Garage Station, a gym, and a bungalow to the rear of the site.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/104/Limpsfield-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|104&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg93a2e364db&amp;ft1542211950&amp;WarlinghamSite.png" length="100" type="image/jpg" />
</item>
<item>
<title>Avonley Road, Phase 1</title>
<guid isPermaLink="false">greenfield_137004</guid>
<pubDate>Mon, 25 Jun 2018 13:24:37 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bespoke Modular Developments Ltd</p>
<h2>Location</h2>
<p>New Cross</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded as sub-contractor to undertake the demolition works at the former MOT/Garage site in New Cross for our second project for Bespoke Modular Developments Ltd.</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip (including separations)</li>
<li>Demolition (full)</li>
<li>Slab and Foundation Removal</li>
<li>Crush Arisings and Stockpile</li>
</ul>
<h2><br />Challenges</h2>
<p>Our biggest challenge at New Cross was the close proximity to the surrounding neighbouring buildings. Each of the four buildings, three of which were removed in phase 1, had to be carefully demolished/dismantled on the boundary walls. This took one of our most experienced teams to complete within three weeks ahead of program.</p>
<p>Phase two is set to commence late 2018 which will bring a more complex method of demolition with the building being structurally weak.&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/103/Avonley-Road-Phase-1</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|103&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf548c9b6fc&amp;ft1542211949&amp;AvonleyRoad2.jpeg" length="100" type="image/jpg" />
</item>

</channel>
</rss>