<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/213/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Fri, 30 Aug 2024 15:05:14 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title></title>
<guid isPermaLink="false">greenfield_193970</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/163/Hockley-Industrial-Estate</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|163&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg743f8a05f9&amp;ft1725026986&amp;Picture3.1.1.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194039</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/170/Lilford-Business-Centre</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|170&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg7253f448d0&amp;ft1731067053&amp;bannerDemolition2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194091</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/175/Lyons-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|175&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg986f914b1e&amp;ft1728408962&amp;lyonsBottom.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_194130</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/199/Lyons-Road---Site-Clearance</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|199&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3bb21317cd&amp;ft1728984661&amp;lyonsClearanceBanner.jpg" length="100" type="image/jpg" />
</item>
<item>
<title></title>
<guid isPermaLink="false">greenfield_197241</guid>
<pubDate>Fri, 30 Aug 2024 15:05:14 +0100</pubDate>
<description><![CDATA[]]></description>
<link>https://www.greenfieldgroup.uk.com:443/215/Bensham-Lane-Thornton-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/folder|215&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg659a11f1b5&amp;ft1769603015&amp;benshamFWBannerExt.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Britannia Wharf</title>
<guid isPermaLink="false">greenfield_137006</guid>
<pubDate>Tue, 24 Jul 2018 14:27:43 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Deepwood Properties</p>
<h4>Site:</h4>
<p>Britannia Wharf, Monument Way, Woking</p>
<h4>Our Role:</h4>
<p>Greenfield Demolition was awarded the demolition package by Deepwood Properties to act as Principal Contractor. This was our first project for Deepwood.</p>
<h4>Our Scope:</h4>
<ul>
<li>R + D Survey</li>
<li>Remove fly-tipped waste</li>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition down to basement level</li>
<li>Remove all arising from site</li>
</ul>
<p>&nbsp;</p>
<p>This was a prestigious project for Greenfield. A four storey 2,500m<sup>2</sup>&nbsp;footprint building with a basement for underground parking.</p>
<p>The building was situated adjacent the Saturn Trail canal which bounded the southern boundary and Horsell Common Conservation Park bounded the others.</p>
<p>Our first operation was to remove the fly-tipped waste from site which was left by people whom broke into the site prior to commencement of the works. We undertook this work throughout the day to keep cost down for the client. A soft strip was carried out in unison by another team to ensure the program was not affected.&nbsp;</p>
<p>The buildings interceptors were turned off when the offices were closed and this led to flooding in the basement. Greenfield worked closely with Deepwood to pump out and dispose of the excess water.</p>
<p>Greenfield managed to recycle 99.6% of all waste arising.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/105/Britannia-Wharf</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|105&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0ed580994a&amp;ft1542887858&amp;BW1-2018-06-19-14-58-16.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Albion Road</title>
<guid isPermaLink="false">greenfield_137460</guid>
<pubDate>Tue, 24 Jul 2018 14:27:43 +0100</pubDate>
<description><![CDATA[<h4>Client:</h4>
<p>Britaniacrest Recycling</p>
<h4>Site:</h4>
<p>Albion Road, Reigate</p>
<h4>Our Role:</h4>
<p>Greenfield Demolition was awarded the demolition works as subcontractor working alongside one of our key suppliers and client Britaniacrest Recycling. We have worked with Britaniacrest since 2003.</p>
<h4>Our Scope:</h4>
<ul>
<li>R + D Survey</li>
<li>Soft Strip</li>
<li>Demolition of Office</li>
<li>Removal of Boundary Wall</li>
<li>Removal of Car Park</li>
<li>All Waste removed by Britaniacrest</li>
</ul>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/150/Albion-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|150&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg599b0bc445&amp;ft1542886647&amp;AlbionRoad.png" length="100" type="image/jpg" />
</item>
<item>
<title>Brighton Road, South Croydon</title>
<guid isPermaLink="false">greenfield_137495</guid>
<pubDate>Fri, 06 Jul 2018 14:21:46 +0100</pubDate>
<description><![CDATA[<h4><u>Overview:</u></h4>
<p>Greenfield Demolition have been awarded the demolition works at South Croydon by Selsdon Building to demolish Car Showroom and ancillary buildings. This job is to be completed over one phase and we are to act as a Subcontractor.</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Separation Works</li>
<li>Demolition of Buildings</li>
<li>Remove Slab and Foundations</li>
<li>Remove Underground tanks</li>
<li>Remove arisings<br /><br /></li>
</ul>
<h4><u>Challenges</u></h4>
<p>The main challenge on this project was the separation works between neighbouring properties adjoining each side of the site</p>
<h4><u>Solution</u></h4>
<p>Using trained operatives and working closely with Selsdon and both neighbours adjoining, Greenfield carried out the separation works using hand tools, working off mobile towers. All operatives are IPAF and PASMA certified. We also worked closely with the structural design team to ensure all the correct propping was in place.</p>
<h4><span style="text-decoration: underline;">Project Review</span></h4>
<p>Client: Selsdon Building<br />Location: South Croydon<br />Start: October 2016<br />Finish: November 2016<br />Program: 7 weeks<br />Recycled: 99%<br /><br />Our Plant Used:</p>
<ul>
<li>22t Excavator</li>
<li>13t Excavator</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/151/Brighton-Road-South-Croydon</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|151&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg3b8505f0bc&amp;ft1542979396&amp;IMG-20160831-WA012.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Leaden Hill Industrial Estate, Coulsdon</title>
<guid isPermaLink="false">greenfield_137496</guid>
<pubDate>Fri, 06 Jul 2018 14:21:46 +0100</pubDate>
<description><![CDATA[<h4><u></u><u>Client:</u></h4>
<h6>The Oakwood Group</h6>
<h4><u>Site:</u></h4>
<p>Leaden Hill Industrial Estate, Coulsdon</p>
<h4><u>Our Role:</u></h4>
<p>Greenfield Demolition were awarded the demolition work by The Oakwood Group. This would be our third project awarded by Oakwood.</p>
<h4><span style="text-decoration: underline;">Our Scope:</span></h4>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolish all buildings</li>
<li>Crush all aggregate arising</li>
</ul>
<p>&nbsp;</p>
<p>This site consisted of six units, all of different sizes, ranging from 70m<sup>2</sup> to 600m<sup>2</sup>. The site was adjacent to Coulsdon Town Train Station, with the two main warehouses sitting within 1.5m of the platform. With all boundaries of the site being associated with Network Rail property, we had to work closely with The Oakwood Group and Network Rail to come up with a suitable method which would not affect the live platform area.</p>
<p>We worked closely with local suppliers to ensure minimal disruption was caused during access to Coulsdon Town Train Station. We employed a watchman to stand on the platform to liaise with the site supervisor to communicate when the platform was busy so works could be suspended until passengers got on the train. This process continued until all sheets were removed from the roof and the wall was lowered to below the boundary fence. Once this was completed our 45t Excavator and our two 22t excavators completed the demolition contract.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/152/Leaden-Hill-Industrial-Estate-Coulsdon</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|152&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2f0ae20ebf&amp;ft1542980976&amp;LeadenHillIndEst52018-03-22-PHOTO-00000096.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Limpsfield Road</title>
<guid isPermaLink="false">greenfield_137005</guid>
<pubDate>Mon, 25 Jun 2018 13:44:40 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bonds Building Contractors Ltd</p>
<h2>Location</h2>
<p>Warlingham</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded the demolition package as sub-contractor for the development works at Limpsfield Road, Warlingham by Bonds Builders. This is our first project for Bonds Builders.</p>
<h2>Program</h2>
<p>8 Weeks</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip</li>
<li>Demolition</li>
<li>Remove Slab and Foundations</li>
<li>Crush All Arisings and Stockpile Onsite</li>
<li>Tree Clearance</li>
<li>Tank (underground) Removal</li>
</ul>
<p><br />The site consisted of a car showroom, an MOT/Garage Station, a gym, and a bungalow to the rear of the site.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/104/Limpsfield-Road</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|104&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg93a2e364db&amp;ft1542211950&amp;WarlinghamSite.png" length="100" type="image/jpg" />
</item>
<item>
<title>Avonley Road, Phase 1</title>
<guid isPermaLink="false">greenfield_137004</guid>
<pubDate>Mon, 25 Jun 2018 13:24:37 +0100</pubDate>
<description><![CDATA[<h2>Client:</h2>
<p>Bespoke Modular Developments Ltd</p>
<h2>Location</h2>
<p>New Cross</p>
<h2>Our Role</h2>
<p>Greenfield Demolition were awarded as sub-contractor to undertake the demolition works at the former MOT/Garage site in New Cross for our second project for Bespoke Modular Developments Ltd.</p>
<h2>Scope</h2>
<ul>
<li>Asbestos Removal</li>
<li>Soft Strip (including separations)</li>
<li>Demolition (full)</li>
<li>Slab and Foundation Removal</li>
<li>Crush Arisings and Stockpile</li>
</ul>
<h2><br />Challenges</h2>
<p>Our biggest challenge at New Cross was the close proximity to the surrounding neighbouring buildings. Each of the four buildings, three of which were removed in phase 1, had to be carefully demolished/dismantled on the boundary walls. This took one of our most experienced teams to complete within three weeks ahead of program.</p>
<p>Phase two is set to commence late 2018 which will bring a more complex method of demolition with the building being structurally weak.&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/103/Avonley-Road-Phase-1</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|103&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf548c9b6fc&amp;ft1542211949&amp;AvonleyRoad2.jpeg" length="100" type="image/jpg" />
</item>
<item>
<title>Lok’N’Store, Millbrook</title>
<guid isPermaLink="false">greenfield_84856</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4 class="p1"><span class="s2">Overview</span></h4>
<p class="p1"><span class="s1">Greenfield Demolition have been awarded the strip out contract by Camistar for the Former Lok&rsquo;n&rsquo;Store storage three-storey building which is to be converted into a Park&rsquo;n&rsquo;Cruise. </span></p>
<h4 class="p1"><span class="s1">Our Scope:</span></h4>
<ul>
<li class="p1"><span class="s1">Strip and Remove all lighting</span></li>
<li class="p1"><span class="s1">Strip and Remove all ceilings and mechanical equipment</span></li>
<li class="p1"><span class="s1">Dismantle and Remove all Lifts and Lift Shafts</span></li>
<li class="p1"><span class="s1">Strip and Remove all plasterboard walls</span></li>
<li class="p1"><span class="s1">Dismantle and Remove roller doors and dock levellers</span></li>
<li class="p1"><span class="s1">Remove all arising from site </span></li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/61/LokNStore-Millbrook</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|61&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg2c43245fc3&amp;ft1469531392&amp;LokNStore-Millbrook.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Hayworthe Villa</title>
<guid isPermaLink="false">greenfield_137008</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<p><span style="text-decoration: underline;"><strong>Client</strong></span>&nbsp; &nbsp;&nbsp;</p>
<p>Sunninghill Construction Co. Ltd<br /><br /><span style="text-decoration: underline;"><strong>Location</strong></span></p>
<p>Haywards Heath<br /><br /><span style="text-decoration: underline;"><strong>Our Role</strong></span></p>
<p>Sub-Contractor<br /><br /><strong><span style="text-decoration: underline;">Summary</span></strong></p>
<p>Strip out works in large office space<br /><br /><strong><span style="text-decoration: underline;">Scope</span>:&nbsp;</strong></p>
<ul>
<li>Remove Partitions</li>
<li>Strip out ceilings</li>
<li>Remove floor coverings</li>
<li>Remove Porch</li>
<li>Remove WCs and Basins</li>
<li>Remove Walls and Tilings</li>
<li>Remove Boilers and Associated Heating System</li>
<li>Remove Kitchen</li>
<li>Form Openings</li>
<li>Remove stair coverings and nosings</li>
</ul>
<p><br /><span style="text-decoration: underline;"><strong>Program</strong></span>&nbsp;</p>
<p>12 days</p>
<p><span style="text-decoration: underline;"><strong>Recycling</strong></span></p>
<p>95%</p>
<p><span style="text-decoration: underline;"><strong>Feedback</strong></span></p>
<p>&lsquo;&rsquo;Very Tidy Job. Very Pleased&rsquo;&rsquo;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/107/Hayworthe-Villa</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|107&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgf85bc5b915&amp;ft1572017305&amp;PHOTO-2019-09-11-13-15-35.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Former REL Office, Bracknell</title>
<guid isPermaLink="false">greenfield_137010</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p class="p1"><span class="s1">Greenfield Demolition was employed as a principal contractor by Hodson Developments to demolish a standalone office building. Our scope was to erect hoarding gates for delivery and pedestrian gates, remove asbestos, strip out, demolish, remove slab and foundations, grub up car park area and remove all arisings from site.</span></p>
<h4 class="p1"><span class="s2">Challenges</span></h4>
<p class="p1"><span class="s1">The main challenge on this project was the program being 5 weeks. The building being a two storey 3000m&sup2; and the car park area to the rear of the office building another 1000m&sup2;.</span></p>
<p class="p1"><span class="s1">The second challenge was the asbestos to the warehouse roof.</span></p>
<h4 class="p1"><span class="s2">Solutions</span></h4>
<p class="p1"><span class="s1">To overcome these challenges, we allocated 90% of our site staff to this project.</span></p>
<p class="p1"><span class="s1">The asbestos roof had to be brought down with the machine. We had exclusions zones and drop zones in place and prior to the removal with had suppressed the sheets with water. We carefully lowered the sheets to ground level straight into a roll on/off bin which was then taken into a licenced waste facility.</span></p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/109/Former-REL-Office-Bracknell</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|109&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg80d4abd498&amp;ft1542211950&amp;IMG-20160720-WA035.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Reigate Business Mews, Reigate</title>
<guid isPermaLink="false">greenfield_161198</guid>
<pubDate>Mon, 25 Apr 2016 16:27:13 +0100</pubDate>
<description><![CDATA[<h4>Overview:</h4>
<p>Greenfield Demolition was employed by Smallworld UK to undertake the demolition works of an office in Reigate. Our scope was to strip out, demolish, remove slab and foundations and remove all arisings from site.</p>
<h4>Challenges</h4>
<p>The main challenge on this project was the neighbouring buildings owner whom had a lot uncertainties and under knowledge with demolition.</p>
<h4>Solutions</h4>
<p>Our supervisor spoke with the neighbour to talk about methods of work and how we would cause minimal disturbance as possible. To create minimal disturbance Greenfield Demolition had one labourer directing a hose on the area of operation to minimise dust. We also used a dust buster machine for the overall site to create less arising dust.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/155/Reigate-Business-Mews-Reigate</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|155&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg5b147cd023&amp;ft1572016633&amp;IMG-20160720-WA049.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>