<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/215/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Wed, 28 Jan 2026 12:50:29 +0000</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title>Waste Report</title>
<guid isPermaLink="false">greenfield_197248</guid>
<pubDate>Wed, 28 Jan 2026 12:50:29 +0000</pubDate>
<description><![CDATA[<p>Greenfield Demolition achieved a 98% recycling rate across all materials removed from site, including:</p>
<ul>
<li>Mixed construction and demolition waste</li>
<li>Wood waste</li>
<li>Metals</li>
<li>Non-recyclable waste</li>
<li>Asbestos waste</li>
</ul>
<p>All concrete and hardcore arisings were crushed on site to a 6F2 specification and stockpiled for reuse during the subsequent development phase, reducing vehicle movements and minimising environmental impact.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/222/Waste-Report</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|222&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg56eada4da8&amp;ft1769613216&amp;benshamWaste.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Solutions</title>
<guid isPermaLink="false">greenfield_197247</guid>
<pubDate>Wed, 28 Jan 2026 12:43:28 +0000</pubDate>
<description><![CDATA[<p class="p1">To mitigate risks associated with the party walls and surrounding properties, Greenfield Demolition&rsquo;s technical team designed and installed a bespoke debris screen system. This system provided full protection to neighbouring buildings throughout the demolition works. Due to site constraints, the debris netting was installed using a crane and remained in situ for the duration of the boundary wall demolition, enabling safe removal down to ground level.</p>
<p>Within the basement, an existing oil tank was found to contain an unknown substance. Greenfield worked closely with a specialist local supplier to sample and analyse the contents. The material was identified as a heavy fuel oil requiring temperature control to remain in a liquid state. A heated tanker was mobilised to site, allowing the safe extraction and removal of the oil, which was transported to a licensed waste facility for refinement.</p>
<p>All works were carefully planned and executed to ensure safety, programme certainty, and minimal disruption to neighbouring stakeholders.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/221/Solutions</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|221&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg91e34dd33a&amp;ft1770042066&amp;benshamScope.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Challenges</title>
<guid isPermaLink="false">greenfield_197246</guid>
<pubDate>Wed, 28 Jan 2026 12:41:00 +0000</pubDate>
<description><![CDATA[<p>The project had multiple challenges to consider, such as:</p>
<ul>
<li>Close proximity to neighbouring residential and commercial properties</li>
<li>Shared party walls requiring controlled hand demolition</li>
<li>An active new-build development adjacent to the site</li>
<li>The presence of contaminants, including asbestos and an unknown liquid within a basement oil tank</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/220/Challenges</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|220&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgbea5f2d3e3&amp;ft1769612633&amp;benshamChallenges.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Project Outcomes</title>
<guid isPermaLink="false">greenfield_197245</guid>
<pubDate>Fri, 30 Aug 2024 15:45:02 +0100</pubDate>
<description><![CDATA[<p>The Bensham Lane project demonstrated Greenfield Demolition&rsquo;s capability to deliver complex demolition works within constrained urban environments. Through detailed planning, innovative protective solutions, and a strong commitment to environmental performance, the project was completed safely, efficiently, and in line with the client&rsquo;s objectives.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/219/Project-Outcomes</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|219&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg35c0ec3f50&amp;ft1770042229&amp;benshamOutcome1.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Project Overview</title>
<guid isPermaLink="false">greenfield_197244</guid>
<pubDate>Fri, 30 Aug 2024 15:33:15 +0100</pubDate>
<description><![CDATA[<p>The building comprised office accommodation and warehouse space, extending to approximately 3,600m&sup2; with an overall height of 15 metres. To the rear of the site stood a 20-metre-high tin-clad chimney, which required careful sequencing and controlled dismantling.</p>
<p>The site was located in a sensitive area, with party walls adjoining neighbouring properties and an active new-build development immediately adjacent. These constraints required detailed planning, close coordination, and robust protective measures throughout the demolition process.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/218/Project-Overview</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|218&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg0fe115293e&amp;ft1769612513&amp;benshamOverview.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Scope of Works</title>
<guid isPermaLink="false">greenfield_197243</guid>
<pubDate>Fri, 30 Aug 2024 15:10:25 +0100</pubDate>
<description><![CDATA[<ul>
<li>Pre-Demolition Waste Audit</li>
<li>Section 80/81 Notice</li>
<li>Licensed and Non-Licensed Asbestos</li>
<li>Demolition Specification Scaffold</li>
<li>Soft Strip of all Buildings</li>
<li>Removal of a large oil tank and its contents</li>
<li>Demolition of the Office and Warehouse Building</li>
<li>Demolition of the chimney stack</li>
<li>Hand Demolition along party walls</li>
<li>Temporary Debris Screen Along Party Wall Boundaries</li>
<li>Crush all arisings to 6F2 for reuse</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/217/Scope-of-Works</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|217&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgb526d6fd6f&amp;ft1770041945&amp;scopeList.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Bensham Lane, Thornton Heath</title>
<guid isPermaLink="false">greenfield_197242</guid>
<pubDate>Fri, 30 Aug 2024 15:06:25 +0100</pubDate>
<description><![CDATA[<p>Greenfield Demolition were appointed by a returning client to deliver the controlled demolition of Lynton&rsquo;s House, a mixed-use office and warehouse building located on Bensham Lane, Thornton Heath.</p>
<p>The project involved the removal of a substantial structure within a constrained urban environment, bordered by neighbouring properties and an adjacent new-build development.</p>
<div class="grid-wrapper grid-three">
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-01.png" />
<h4>6505 Man Hours</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-02.png" />
<h4>3982.52 Tonnes</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-03.png" />
<h4>26 Weeks</h4>
</div>
</div>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/216/Bensham-Lane-Thornton-Heath</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|216&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg83eff45071&amp;ft1770041624&amp;3demolitonPlanBenshamLane.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>