<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--
  This web page is actually a data file that is meant to be read by RSS reader programs.
-->
<channel>
<atom:link href="https://www.greenfieldgroup.uk.com/224/xml/" rel="self" type="application/rss+xml" />
<title>www.greenfieldgroup.uk.com</title>
<link>https://www.greenfieldgroup.uk.com:443</link>
<description>News for www.greenfieldgroup.uk.com</description>
<language>en-gb</language>
<lastBuildDate>Wed, 06 May 2026 12:43:17 +0100</lastBuildDate>
<copyright>Copyright: (C) Greenfield Demolition</copyright>
<ttl>15</ttl>

<item>
<title>Waste Report</title>
<guid isPermaLink="false">greenfield_197600</guid>
<pubDate>Wed, 06 May 2026 12:43:17 +0100</pubDate>
<description><![CDATA[<p>Greenfield Demolition achieved a 99.87% recycling rate across all materials removed from</p>
<p>site, including:</p>
<ul>
<li>Mixed construction and demolition waste</li>
<li>Wood waste</li>
<li>Metals</li>
<li>Non-recyclable waste</li>
<li>Aggregate material (crushed on site)</li>
<li>Asbestos waste</li>
</ul>
<p>All concrete and hardcore arisings were crushed on site to a 6F2 specification generating approx. 7000 tonnes of reusable material and stockpiled for reuse during the subsequent development phase, reducing vehicle movements and minimising environmental impact.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/231/Waste-Report</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/lib/static/img.php?im=/media/icons/image_place_holder.png&amp;sz=150x150&amp;cp=&amp;tn=&amp;ql=&amp;fm=&amp;bo=&amp;bc=&amp;sg=91166fb0a1&amp;ft=1716456889&amp;ca=&amp;jp=" length="100" type="image/jpg" />
</item>
<item>
<title>Solutions - Ecology &amp; Live Residential</title>
<guid isPermaLink="false">greenfield_197599</guid>
<pubDate>Wed, 06 May 2026 12:19:08 +0100</pubDate>
<description><![CDATA[<p><strong>Ecology Works:</strong></p>
<p>Greenfield Demolition worked in close coordination with ecological specialists to ensure all works were carried out in compliance with environmental and wildlife potection requirements. Pre-commencement surveys were undertaken where necessary, and any ecological constraints were carefully incorporated into the programme. Works were sequenced to avoid sensitive periods, and exclusion zones were implemented where required to protect habitats and ensure full compliance with relevant legislation.</p>
<p><strong>Live Residential Development Environment:</strong></p>
<p>With the site surrounded by an active residential new-build development, maintaining safety and minimising disruption was a key priority. A detailed logistics and site management plan was implemented to control vehicle movements, deliveries, and waste removal. Clear segregation between demolition activities and the surrounding development was maintained at all times, supported by robust fencing, signage, and controlled access points. Ongoing communication with site stakeholders ensured that neighbouring works could continue safely and without interruption.</p>
<p>&nbsp;</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/230/Solutions---Ecology-Live-Residential</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/lib/static/img.php?im=/media/icons/image_place_holder.png&amp;sz=150x150&amp;cp=&amp;tn=&amp;ql=&amp;fm=&amp;bo=&amp;bc=&amp;sg=91166fb0a1&amp;ft=1716456889&amp;ca=&amp;jp=" length="100" type="image/jpg" />
</item>
<item>
<title>Solutions - Contamination &amp; Environmental</title>
<guid isPermaLink="false">greenfield_197598</guid>
<pubDate>Wed, 06 May 2026 12:16:29 +0100</pubDate>
<description><![CDATA[<p><strong>Contaminated Materials (Including Asbestos):</strong></p>
<p>The presence of contaminants, including asbestos-containing materials, was managedvthrough a structured and compliant approach. All asbestos works were carried out in accordance with current regulations by a licensed subcontractor, using appropriately trained operatives and controlled removal methods. Segregation, safe handling, and compliant disposal procedures were implemented for all hazardous materials, ensuring risks to operatives, the public, and the environment were effectively controlled.</p>
<p><strong>Environmental Considerations:</strong></p>
<p>A range of environmental control measures were implemented to minimise the impact of demolition activities on the surrounding area. These included dust suppression through water management, noise reduction through the use of appropriate plant and working methods, and vibration monitoring where required. Works were carefully planned and sequenced to&nbsp;limit disturbance, particularly given the proximity of residential properties. This proactive approach ensured compliance with environmental requirements while maintaining programme efficiency.</p>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/229/Solutions---Contamination-Environmental</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/lib/static/img.php?im=/media/icons/image_place_holder.png&amp;sz=150x150&amp;cp=&amp;tn=&amp;ql=&amp;fm=&amp;bo=&amp;bc=&amp;sg=91166fb0a1&amp;ft=1716456889&amp;ca=&amp;jp=" length="100" type="image/jpg" />
</item>
<item>
<title>Project Outcomes</title>
<guid isPermaLink="false">greenfield_197597</guid>
<pubDate>Fri, 30 Aug 2024 15:45:02 +0100</pubDate>
<description><![CDATA[<p>The Woodside Conference Centre project demonstrates Greenfield Demolition’s ability to deliver complex demolition works within sensitive residential environments. Through detailed planning, effective stakeholder coordination, and a strong commitment to environmental performance, the project was completed safely, efficiently, and in line with the client’s
objectives.</p>
]]></description>
<link>https://www.greenfieldgroup.uk.com:443/228/Project-Outcomes</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|228&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgba475356f8&amp;ft1778065355&amp;lyonsClearanceOverviewList.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Project Description</title>
<guid isPermaLink="false">greenfield_197596</guid>
<pubDate>Fri, 30 Aug 2024 15:33:15 +0100</pubDate>
<description><![CDATA[<p>The building comprised a hotel and conference centre. The structure extended to approximately 4,800m&sup2; and exceeded 15 metres at its highest point, requiring a carefully sequenced demolition approach due to its size and proximity to neighbouring residential properties and a nearby school.</p>
<p>These constraints required detailed planning, close coordination, and robust protective measures throughout the demolition process.</p>
<h4>Challenges</h4>
<p>The project had multiple challenges to consider, such as:</p>
<ul>
<li>Ecology constraints</li>
<li>Active residential new-build development</li>
<li>Presence of contaminants, including asbestos</li>
<li>Environmental considerations (noise, dust and vibration)</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/227/Project-Description</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|227&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgce13b19cc7&amp;ft1778065355&amp;lyonsClearanceOverviewList2.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Scope of Works</title>
<guid isPermaLink="false">greenfield_197595</guid>
<pubDate>Fri, 30 Aug 2024 15:10:25 +0100</pubDate>
<description><![CDATA[<ul>
<li>Pre-Demolition Waste Audit</li>
<li>Demolition Phase Plan incorporating Demolition Environmental Management Plan</li>
<li>Section 80/81 Notice</li>
<li>Ecology Works</li>
<li>Tree Protection Work</li>
<li>Licensed and Non-Licensed Asbestos Removal</li>
<li>Soft Strip of all Buildings</li>
<li>Removal of a large oil tank and its contents</li>
<li>Demolition of the Hotel and Conference Centre&nbsp;</li>
<li>Demolition of the chimney stack</li>
<li>Crushing of all arisings to 6F2 specification for reuse</li>
<li>Backfill and compact basement and swimming pool</li>
<li>Post Demolition Audit</li>
</ul>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/226/Scope-of-Works</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|226&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sg1d19f7d742&amp;ft1778065355&amp;lyonsClearanceScopeList.jpg" length="100" type="image/jpg" />
</item>
<item>
<title>Woodside Conference Centre, Kenilworth</title>
<guid isPermaLink="false">greenfield_197594</guid>
<pubDate>Fri, 30 Aug 2024 15:06:25 +0100</pubDate>
<description><![CDATA[<p>Greenfield Demolition were appointed to deliver the controlled demolition of the Woodside Conference Centre in Kenilworth.</p>
<p>The project involved the removal of a substantial hotel and conference facility located within a newly developed residential area, requiring careful planning and coordination to manage surrounding constraints.</p>
<p>Work commenced in September 2025 and was completed in January 2026.</p>
<div class="grid-wrapper grid-three">
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-01.png" />
<h4>&nbsp;Man Hours</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-02.png" />
<h4>&nbsp;Tonnes</h4>
</div>
<div class="grid three icon"><img src="/_data/site/172/_default/iconsSolid-03.png" />
<h4>&nbsp;16 Weeks</h4>
</div>
</div>]]></description>
<link>https://www.greenfieldgroup.uk.com:443/225/Woodside-Conference-Centre-Kenilworth</link>
<enclosure url="https://www.greenfieldgroup.uk.com:443/cache/img/172/pg|225&amp;sz150x150&amp;cp&amp;tn&amp;ql&amp;fm&amp;bo&amp;bc&amp;sgd4dcd05945&amp;ft1778070915&amp;woodsideBanner1.jpg" length="100" type="image/jpg" />
</item>

</channel>
</rss>