Call us on 01293 614004
You are viewing this site in staging mode. Click in this bar to return to normal site.
x#{notify_img}
#{notify_title}
#{notify_text}

Solutions - Contamination & Environmental

Contaminated Materials (Including Asbestos):

The presence of contaminants, including asbestos-containing materials, was managedvthrough a structured and compliant approach. All asbestos works were carried out in accordance with current regulations by a licensed subcontractor, using appropriately trained operatives and controlled removal methods. Segregation, safe handling, and compliant disposal procedures were implemented for all hazardous materials, ensuring risks to operatives, the public, and the environment were effectively controlled.

Environmental Considerations:

A range of environmental control measures were implemented to minimise the impact of demolition activities on the surrounding area. These included dust suppression through water management, noise reduction through the use of appropriate plant and working methods, and vibration monitoring where required. Works were carefully planned and sequenced to limit disturbance, particularly given the proximity of residential properties. This proactive approach ensured compliance with environmental requirements while maintaining programme efficiency.